CircuitBridge
Coming soon.
Built around the systems your team already uses.
Built with BC electricians.
Needs attention
Material requests · crew chat
lvl 8: 20 4" plates, 20 boxes and 40 lengths of 1/2 conduit
4x4 vapour barriers
Sam · 4x4 vapour barriersdownstairs outside lockup
2 to order · 1 to confirm · 1 in lockup
Job labour
92hover earned
Earned labour = budgeted hours for installed quantity.
Change review
Main feeder route revised after rough-in started
DrawingE2.08 · Rev 6
Compared withTender / previous issue
FieldRough-in started
Potential impactLabour · material · schedule
NextPrice impact before proceeding
Bid review
Switchgear quotation missing
MissingSupplier quote
ReviewAddendum 3 scope
ClosesThu · 2:00 PM
NextResolve pricing gaps
2 items before close
Matched material
4" octagon cover · 1/2" KO
20eaLevel 8 corridor rough-in
Match
Likely
Source
Company material catalog
Next
Confirm before delivery
ConfirmEvidence
Broadway Tower · Level 8
Progress
Installed quantities · production
Labour
Timecards + cost codes
Confirmed
Foreman production confirmation
Next
Review labour vs installed quantity
Evidence
Potential change event
Scope
TBD vs tender
Approval
No ASI or CCD on file
Decide by
Before feeder pull
Bid risk
Unpriced scope before submission
Quote
Switchgear supplier outstanding
Addendum
Lighting controls not repriced
Options
Price both or qualify the bid